Wednesday 19 December 2007

Rhodia UK Limited - Oldbury
Supplied materials, labour and access equipment to install and commission a trace heating system to maintain a temperature of +40°C.
John Lennon Airport - Liverpool
Designed, supplied and installed ramp heaters for the airports multi story car park. 1420m of constant wattage tape was used to complete this project.

Friday 14 December 2007

Halewood International Ltd - Liverpool
For this project we supplied materials and labour to install trace heating to temperature maintain stainless steel pipework at 60°C. In total there were 41m of pipe about 3m up complete with 2 pumps, 1 short tee, 3 flanges and 1 union.
Marstons Brewery - Burton
ESH supplied, installed and commissioned a trace heating system to provide frost protection to plastic pipework in a minimum ambient temperature of -15°C.

Wednesday 5 December 2007

BT Oswestry Data Centre
This project was split into two parts - 

  • Supply materials and labour to extend the original trace heating system to proved frost protection to the Van Spall plant pack units
  • Supply and install the remote trace heating BMS panels & JBTRA BMS ready junction box thermostat

Friday 30 November 2007

Ferrybridge Power Station - Knottingley
ESH designed and supplied 2 x pump heating jackets - 1.5KW at 110v supply.
Smallmead Waste Management - Reading
To supply and install trace heating and thermal insulation to provide frost protection to the fire pump suction & delivery lines, the external MRF building distribution mains plus internal grid lines 4 to 19 and the tank infill line. 

Thursday 29 November 2007

Marks & Spencers - Eden
For this brand new store, ESH supplied and installed trace heating to provide frost protection to the HWS flow & return, MWS, BCWS, IBCWS and the warning pipework within the canopy and tankroom areas.

Monday 26 November 2007

New B&Q Store - Halifax
For this new store, ESH supplied and installed 45m of trace heating to frost protect the cold water services.

Thursday 22 November 2007

Saacke Ltd - Portsmouth
Designed and supplied 180 x SP80/2 spiral wire 1.8m length, 80w/m, 240v heating tape.

Tuesday 20 November 2007

Sun Valley Foods - Lincoln 
Supplied materials only to provide frost protection to 25mm Ø blue ABS water pipework.

Monday 19 November 2007

Instrument Design Technology Ltd - Warrington
Designed and supplied a high temperature bake out heating jacket which provided a operating temperature at +250°C with a 220v supply.

Monday 12 November 2007

Ciba Speciality Chemicals - Bradford
Supplied 200m of SCBX30/2 ATEX approved constant wattage heating tape.

Tuesday 6 November 2007

Four Crosses STW - Powys
Supplied materials and labour to install and commission both trace heating and thermal lagging in order to provide frost protection to the ductile iron and steel pipework. 

Monday 29 October 2007

Disc Chicksands STW - Shefford
ESH were contracted to go back to this site to supply and install thermal insulation to the trace heated pipework which we previously installed.

Thursday 25 October 2007

New Debenhams Store - Liverpool
ESH were contracted to maintain +55°C on various sized HWS flow pipework on the buildings second floor. 180m of H2OWAT55 was supplied and installed.

Monday 22 October 2007

Williamthorpe STW - Chesterfield
Supplied and installed frost protection trace heating to approximately 32m of pipework using our type FBTBOJ tape.

Friday 19 October 2007

Banwell WTW - Bristol
Supplied and installed frost protection trace heating to approximately 45m of pipework.

Thursday 18 October 2007

Next Home Store - Tottenham Court Road
Before this new store could open, ESH supplied materials and labour to install and commission the trace heating system to maintain the DHWS pipework at +55°C.

Wednesday 17 October 2007

Drayton House - Stourbridge
ESH were contracted to upgrade the existing leak detection control panel to a 20 zone unit and return to site to re-terminate the 16 zones and install 4 new zones monitoring oil detectors, located under the oil feed pipe line and around the final connection to the boiler.

Tuesday 16 October 2007

Walsall Manor Hospital 
Our third job within Walsall Manor involved supplying and installing a trace heating system to maintain 55m of DHWS pipework at +55°C in an ambient of +18°C.

Monday 15 October 2007

Lafarge Cement UK Plc - Derby
The project scope was to supply materials and labour to install and commission the trace heating system. Then leg and clad the hopper & associated pipework in order to maintain +60°C.

Friday 5 October 2007

The Institute Of Advanced Technology - Oxford
Here at this University of Oxford building , ESH supplied and installed trace heating to frost protect the roof mounted pipework. The pipework included 280m of domestic HWS, CWS and CHW services pipe.

Wednesday 3 October 2007

Walsall Manor Hospital 
For this project ESH supplied materials and labour to install and commission the trace heating system to maintain the DHWS pipework at +55°C, together with a temperature controller to purge the system once a week a +65°C. This project required 400m of type H2OWAT65 self limiting heating tape.

Thursday 27 September 2007

Paradise Street Site 13 - Liverpool
ESH were contracted for the second time at this site, this time to supply materials and labour to frost protect 90m of BCWS pipework.

Monday 24 September 2007

BT Oswestry Data Centre
For this our second project within the Data Centre, ESH designed, supplied and installed a Aqualarm leak detection system, based on perimeter sensing, covering AC units and condensate pipework crossing the Comms room.

Thursday 20 September 2007

Lane Shaw WWTW - Colne 
ESH supplied and installed 300m of type FBTBOJ self regulating heating tape to various plant areas.

Monday 17 September 2007

Reckitt Beckniser Ltd - Derby
For our second project here, ESH supplied materials and labour to install a trace heating system to maintain a temperature of +30°C on two steel vessels. Each vessel was 2.75m Ø and 7.1m tall overall, resting on legs.

Thursday 13 September 2007

Avonmouth WWTW
Supplied and installed frost protection trace heating to steel, stainless and plastic pipework in the following areas: 

  • 170m of digester feed pipework
  • 80m of stainless/ductile pipework from tank to gravity feed thickener units
  • 49m of plastic pipework to GFT units
  • 65m of sludge feed pipes to 3 mono pumps
  • 137m of washwater pipe from pump area to GFT area
  • 50m of hydrant washwater pipework
  • 12m of galvanised drain pipework

Friday 7 September 2007

Paradise Street Site 13 - Liverpool
Supplied and installed trace heating to provide frost protection to 110m of 22mm Ø copper pipework.

Thursday 6 September 2007

BT Oswestry Data Centre
Supplied materials and labour to install a trace heating system to provide frost protection to exposed chilled water pipework in the following areas: 

  • Hall One pipework - 81m
  • Compound A pipework - 310m
  • Gantry B pipework - 708m

Monday 3 September 2007

Craven Swimming Pool - Skipton
Supplied materials and labour to install and commission the trace heating system to provide frost protection on the external heating pipework.

Tuesday 28 August 2007

Russells Hall Hospital - Dudley
Supplied and installed an additional 40m of FBTBOJ self regulating heating tape to provide frost protection to the CHW pipework.

Friday 24 August 2007

HSBC National Data Centre - Bootle
The scope of this project was to design, supply, install and commission a leak detection system to monitor the flow and return chilled water pipework within the floor void of the data hall in phase 3 building. Also within the phase 3 building ESH were contracted to frost protect 63m of foam suppression pipework.

Wednesday 22 August 2007

Cotton Valley WTW - Milton Keynes 
ESH supplied and installed frost protection trace heating to approximately 63m of 1" and 2" water pipework associated with 6 vessels.

Tuesday 21 August 2007

Atlas Quarry Works - Batley
Supplied and installed a trace heating system to a large industrial dust hopper. The hopper needed to maintain a temperature of +50°C.

Monday 20 August 2007

Andrew Corporation - USA
Another large order from this American communications giant. ESH supplied and designed 96 x 3.7 dish heater panels heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Friday 17 August 2007

Reckitt Beckniser Ltd - Derby
To supply and install 240 volt trace heating to temperature maintain pipework and a tank at +30°C. Section one comprised of one tank plus the associated pipework, all in a safe area - Section two comprised of pipework only associated with another tank, which was situated in a Zone 1 Temperature Class T3 Gas Group 2B.

Tuesday 14 August 2007

Lancaster Audi Showroom
Supplied materials and labour to install and commission the trace heating system to provide frost protection to 55m of 40mm Ø plastic pipework.

Monday 6 August 2007

Thomas Deacon Academy - Peterborough

Supplied and installed the Trace Heating system to provide frost protection to the exposed pipework. This modern Academy required 2700m of tape used in total.

Friday 3 August 2007

Western Favell School - Northampton
430m of our type VC constant wattage heating tape was supplied and installed to provide frost protection to the schools water pipework services.

Thursday 2 August 2007

Wissington Sugar Factory - Stoke Ferry
ESH supplied 350m of type FBTBOJ self regulating tape and also 75m of Traceco20/2 (ATEX approved self limiting tape) to be installed within the factory.

Wednesday 1 August 2007

Liquid Plastics Ltd - Preston
ESH designed, supplied and installed trace heating and thermal insulation to pipework in order to heat up and maintain +110°C. The system was designed to heat up the liquid plastic from +20°C to +100°C in between 6-7 hours.

Monday 30 July 2007

Alstom Power Ltd - Rugby
Supplied and installed trace heating and thermal insulation to temperature maintain a VDR vapour storage vessel and its associated pipework. The 100mm NB suction pipework needed to maintain a temperature of +15°C whilst the remainder, including the vessel, needed to maintain +25°C to prevent condensation.

Friday 27 July 2007

Leyton Orient Football Club - North Stand
At the home of this East London football club, ESH supplied and installed the trace heating system to provide frost protection to the MCW pipework within the stadiums North Stand.

Wednesday 25 July 2007

Andrew Corporation - USA
For the second time this year, ESH supplied and designed 32 x 3.7 dish heater panels heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Monday 23 July 2007

La Farge Cement UK - Birmingham
625m of our type VC constant wattage heating cable was supplied and installed to provide frost protection to various pipe works.

Wednesday 18 July 2007

Cadbury - Birmingham
For this tasty project, ESH supplied and installed trace heating to temperature maintain the DHWS at +55°C and also frost protected the CHWS and LTHW pipework. Areas of work to comprise the roof, three risers, toilets and lower ground.

Monday 16 July 2007

Disc Chicksnads STW - Shefford 
The project scope here was to supply and install trace heating and thermal insulation to frost protect the following fittings -  

  • Wash water plumbing station
  • Sludge pumping station
  • Balancing tank
  • Sludge tank
  • Humus pumping station

Wednesday 11 July 2007

Scottish Gas - Edinburgh
Supplied materials and labour to install and commission a trace heating system to provide frost protection to the external chilled water pipework on the buildings roof.

Monday 9 July 2007

Portosilo Ltd - Huntington
Designed, supplied and installed a trace heating system to maintain a temperature of 30°C on both a 1 off screw conveyor tube (fully round) 150mm dia x 7.2m long and a 1 off drop chute 150mm dia x 3m long.

Thursday 5 July 2007

Cerform Ltd - Northampton
The project scope was to supply and install trace heating to temperature maintain 228m of 3" stainless steel Emulsion pipework at +40°C and to frost protect 25m of 2" water pipework.

Tuesday 3 July 2007

M&S Store - Eagle Centre Derby
ESH supplied and installed a trace heating system to frost protect the roof mounted CHW, heating and cold water pipework. 360m of pipework in total.

Monday 2 July 2007

ASDA Distribution Centre - Washington 
Supplied our type VC constant wattage tape to provide frost protection.

Tuesday 26 June 2007

Derby STW
For this project we supplied and installed a 240 volt trace heating frost protection system for plastic pipework to be maintained at around +15°C.

Friday 22 June 2007

Drayton House - Stourbridge 
ESH designed, supplied and installed a leak detection system to provide frost protection to the basement area.

Wednesday 20 June 2007

Welwyn Garden Carriage Wash
Supplied, installed and commissioned the frost protection trace heating and insulation.

Monday 11 June 2007

Far Baulker Pumping Station
Supplied and installed the trace heating systems to provide frost protection on the following circuits - Anion units, Waste water tank, Salt saturation & Recovered rinse water tank pipelines.

Monday 4 June 2007

Sunrise Senior Living - Tettenhall
Supplied labour and materials to install and commission trace heating to the external CHW, Irrigation, VT and CT heating pipework.

Monday 28 May 2007

St Stephens Shopping Centre - Hull

Within Hulls most stylish shopping centre, we supplied and installed the Trace Heating system to provide frost protection to the main chilled water services. To complete the project we ended up using 1200m of FBT10/2 heating tape.

Thursday 24 May 2007

HSBC National Data Centre - Bootle
Our second project here was to supply and install frost protection trace heating for the external secondary containment light fuel oil pipework.

Monday 21 May 2007

Church Of The Latter Day Saints - Burton Upon Trent
This project involved ESH supplying and installing frost protection to 154m of heating pipe and 27m of CWS pipe, as well as to temperature maintain 36m of HWS pipework at 55°C.

Monday 14 May 2007

Management Development Centre - University Of Wales
For this project we supplied materials and labour to install and commission trace heating to provide frost protection on 50mm dia chilled water pipe and 15mm dia BCWS pipe external to the Alun Building similarly at the Dyfrdwy Building.
Purtna Petcare - Sudbury
Supplied 50m of our type SC constant wattage heating tape.

Thursday 10 May 2007

Dunston School - Northampton 
ESH supplied and installed the trace heating to provide frost protection to both the exposed water services and the sprinkler pipework.

Tuesday 8 May 2007

Earl Spencer School - Northampton
Supplied and installed frost protection trace heating on an additional 150m of pipework.

Friday 4 May 2007

Tesco Store - Fulbourn
Supplied VC constant wattage heating cable to be installed onto the sprinkler system in order to frost protect the system.

Monday 16 April 2007

Sittingbourne WWTW - Kent
For this our second project within this WWTW, ESH supplied and installed the trace heating, lagging and cladding to 25m of plastic pipework providing frost protection.

Friday 13 April 2007

Stadco Ltd - Shrewsbury
Within this Zone 1 Gas Group IIB temp Class T3 Hazardous Area, ESH supplied and installed the trace heating, lagging and cladding to provide frost protection to the Sea Water inlet and outlet pipework.

Wednesday 11 April 2007

HSBC National Data Centre - Bootle
For this large project ESH provided frost protection trace heating to the chilled water pipework up to 200mm NB and also two buffer vessels. Just over 1200m of VC constant wattage tape was supplied and installed .

Thursday 5 April 2007

Ronseal Ltd - Sheffield
Supplied, installed and commissioned the trace heating, lagging and cladding to the sprinkler system to provide frost protection.

Monday 2 April 2007

TS Tech UK Ltd - Swindon 
Designed and supplied 3 IBC heating jackets 1000w 240v complete with thermostat control.

Monday 26 March 2007

49 The Bishops Avenue - London
Supplied 1200m of WinterTrace constant wattage tape for frost protection.

Wednesday 21 March 2007

New CWM - Letchworth 
Supplied and installed the frost protection trace heating and insulation system.

Monday 12 March 2007

Cambridge Technology Centre
Supplied our type VC constant wattage heating cable for this project.

Tuesday 6 March 2007

Structurgruppen AB - Kungsbacka 
Designed and supplied 5 x SES insulation heating jackets 400w 230v, with a working temperature of 250°C.
HSBC National Data Centre - Bootle


ESH supplied and installed 1200m of Trace Heating tape for frost protection and also designed, supplied and installed a leak detection system to protect two large data halls.

Friday 2 March 2007

Dairy Crest - Foston 
Here ESH supplied and installed the trace heating system to maintain a temperature between +5°C to +15°C on 25mm stainless steel pipework containing acid and caustic soda.

Wednesday 28 February 2007

CPS Fuels Ltd - Norwich
Supplied and installed trace heating tape, installation and cladding to maintain +15°C in a Zone 1 Hazardous Area Gas Group IIB temp Class T3.

Monday 26 February 2007

Cotts Beverages - Kegworth
This project involved trace heating of Glucose pipework and tank. The tank was 4.3m tall, 3.5m diameter with approximately 15m of pipework, which all needed to be maintained at 50°C.

Friday 23 February 2007

New Romney WWTW - Kent
Supplied, installed and commissioned the trace heating systems to provide frost protection on the following circuits - Anion units, waste water tank, salt saturation & recovered rinse water tank pipelines.

Thursday 22 February 2007

Quarry Hill WWTW - Carlisle
ESH were contracted to go back to Quarry Hill WWTW to supply and install trace heating, lagging and cladding to frost protect 3 tanker points.

Tuesday 20 February 2007

Moy Park Ltd - Sleaford 
ESH supplied and installed VC constant wattage heating tape to provide frost protection for this large producer of organic and free range poultry.

Friday 16 February 2007

Cardinal Place - London
Supplied H2OWAT55 self limiting heating tape to this retail and office development project.

Tuesday 13 February 2007

Bowmer & Kirkland Ltd - Rotherham
Supply materials and labour to install and commission trace heating to frost protect 2 large carrier units and one small unit. 

Tuesday 6 February 2007

Park Plaza Hotel - Cardiff
Supplied ESRS self regulating heating tape for installation within the hotels health club.

Friday 2 February 2007

Tesco Store - Trowbridge
ESH supplied ESRS self regulating heating tape to be installed within the above site.

Thursday 1 February 2007

Quarry Hill WWTW - Carlisle
For this project we supplied the materials and labour to install and commission the trace heating tape, lagging and cladding to 3 connections attached to a large GRP tank to provide frost protection.

Thursday 25 January 2007

Wigston STW - Countesthorpe 
Supplied 100m of ESRSBOJ self regulating heating tape.

Tuesday 23 January 2007

Salisbury's Supermarket - Borehamwood
Supplied VC20/2 constant wattage heating tape for the purpose of frost protection.

Monday 22 January 2007

Clayton Commercial Ltd - Burscough 
ESH repaired the existing trace heating system situated on the service heating tank.

Thursday 18 January 2007

Sittingbourne WWTW - Kent
The project scope was for ESH to supply and install trace heating, lagging and thermal cladding to provide frost protection to the Cess Balance Tank Overflow, Cess Pass Forward Pumps, Sludge Press Pumps, Cess Reception Tank & Washer pipework.

Monday 15 January 2007

Pyewipe STW - Grimsby
Supplied our type FBTB10/1 self limiting heating tape to this project.
Doncaster Racecourse
Doncaster is one of the oldest established centres for horse racing in Britain and ESH were contracted to supply and install the Trace Heating system to provide frost protection to the exposed pipework services. This needed 1400m of VCB12/2 tape in total.

Friday 12 January 2007

Telford House - London
Supplied 370m of H2OWAT55 self regulating heating tape to this London based project.

Thursday 11 January 2007

Corus - Lackenby Works
This project involved ESH suppling the materials and labour to install a trace heating system to 870m of heavy oil supply pipework in order to maintain a temperature of +60°C.

Monday 8 January 2007

Gist Ltd - Thatcham
Supplied and installed trace heating to frost protect 50m of plastic pipework within this large  distribution centre. 

Thursday 4 January 2007

Andrew Corporation - USA
Supplied and designed 32 x 3.7 dish heater panels heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.
Woolston WTW - Southampton 
ESH supplied type FBT10/1 self limiting heating tape to this project.

Wednesday 3 January 2007

Oilfield Electric Marine Inc - USA
ESH designed and supplied 300 x HZIGS1700 1700mm long 140w 240v, hazardous area, high temperature glass insulated heating tape suitable for temperatures up to 450°C.