Wednesday 19 December 2007

Rhodia UK Limited - Oldbury
Supplied materials, labour and access equipment to install and commission a trace heating system to maintain a temperature of +40°C.
John Lennon Airport - Liverpool
Designed, supplied and installed ramp heaters for the airports multi story car park. 1420m of constant wattage tape was used to complete this project.

Friday 14 December 2007

Halewood International Ltd - Liverpool
For this project we supplied materials and labour to install trace heating to temperature maintain stainless steel pipework at 60°C. In total there were 41m of pipe about 3m up complete with 2 pumps, 1 short tee, 3 flanges and 1 union.
Marstons Brewery - Burton
ESH supplied, installed and commissioned a trace heating system to provide frost protection to plastic pipework in a minimum ambient temperature of -15°C.

Wednesday 5 December 2007

BT Oswestry Data Centre
This project was split into two parts - 

  • Supply materials and labour to extend the original trace heating system to proved frost protection to the Van Spall plant pack units
  • Supply and install the remote trace heating BMS panels & JBTRA BMS ready junction box thermostat