Russells Hall Hospital - Dudley
Supplied and installed an additional 40m of FBTBOJ self regulating heating tape to provide frost protection to the CHW pipework.
Tuesday 28 August 2007
Friday 24 August 2007
HSBC National Data Centre - Bootle
The scope of this project was to design, supply, install and commission a leak detection system to monitor the flow and return chilled water pipework within the floor void of the data hall in phase 3 building. Also within the phase 3 building ESH were contracted to frost protect 63m of foam suppression pipework.
The scope of this project was to design, supply, install and commission a leak detection system to monitor the flow and return chilled water pipework within the floor void of the data hall in phase 3 building. Also within the phase 3 building ESH were contracted to frost protect 63m of foam suppression pipework.
Wednesday 22 August 2007
Tuesday 21 August 2007
Monday 20 August 2007
Friday 17 August 2007
Reckitt Beckniser Ltd - Derby
To supply and install 240 volt trace heating to temperature maintain pipework and a tank at +30°C. Section one comprised of one tank plus the associated pipework, all in a safe area - Section two comprised of pipework only associated with another tank, which was situated in a Zone 1 Temperature Class T3 Gas Group 2B.
To supply and install 240 volt trace heating to temperature maintain pipework and a tank at +30°C. Section one comprised of one tank plus the associated pipework, all in a safe area - Section two comprised of pipework only associated with another tank, which was situated in a Zone 1 Temperature Class T3 Gas Group 2B.
Tuesday 14 August 2007
Monday 6 August 2007
Friday 3 August 2007
Thursday 2 August 2007