Wednesday 17 October 2007

Drayton House - Stourbridge
ESH were contracted to upgrade the existing leak detection control panel to a 20 zone unit and return to site to re-terminate the 16 zones and install 4 new zones monitoring oil detectors, located under the oil feed pipe line and around the final connection to the boiler.

No comments:

Post a Comment