Friday 30 November 2007

Ferrybridge Power Station - Knottingley
ESH designed and supplied 2 x pump heating jackets - 1.5KW at 110v supply.
Smallmead Waste Management - Reading
To supply and install trace heating and thermal insulation to provide frost protection to the fire pump suction & delivery lines, the external MRF building distribution mains plus internal grid lines 4 to 19 and the tank infill line. 

Thursday 29 November 2007

Marks & Spencers - Eden
For this brand new store, ESH supplied and installed trace heating to provide frost protection to the HWS flow & return, MWS, BCWS, IBCWS and the warning pipework within the canopy and tankroom areas.

Monday 26 November 2007

New B&Q Store - Halifax
For this new store, ESH supplied and installed 45m of trace heating to frost protect the cold water services.

Thursday 22 November 2007

Saacke Ltd - Portsmouth
Designed and supplied 180 x SP80/2 spiral wire 1.8m length, 80w/m, 240v heating tape.

Tuesday 20 November 2007

Sun Valley Foods - Lincoln 
Supplied materials only to provide frost protection to 25mm Ø blue ABS water pipework.

Monday 19 November 2007

Instrument Design Technology Ltd - Warrington
Designed and supplied a high temperature bake out heating jacket which provided a operating temperature at +250°C with a 220v supply.

Monday 12 November 2007

Ciba Speciality Chemicals - Bradford
Supplied 200m of SCBX30/2 ATEX approved constant wattage heating tape.

Tuesday 6 November 2007

Four Crosses STW - Powys
Supplied materials and labour to install and commission both trace heating and thermal lagging in order to provide frost protection to the ductile iron and steel pipework.