Walsall Manor Hospital 
For this project ESH supplied materials and labour to install and commission the trace heating system to maintain the DHWS pipework at +55°C, together with a temperature controller to purge the system once a week a +65°C. This project required 400m of type H2OWAT65 self limiting heating tape.