Monday 30 July 2007

Alstom Power Ltd - Rugby
Supplied and installed trace heating and thermal insulation to temperature maintain a VDR vapour storage vessel and its associated pipework. The 100mm NB suction pipework needed to maintain a temperature of +15°C whilst the remainder, including the vessel, needed to maintain +25°C to prevent condensation.

Friday 27 July 2007

Leyton Orient Football Club - North Stand
At the home of this East London football club, ESH supplied and installed the trace heating system to provide frost protection to the MCW pipework within the stadiums North Stand.

Wednesday 25 July 2007

Andrew Corporation - USA
For the second time this year, ESH supplied and designed 32 x 3.7 dish heater panels heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Monday 23 July 2007

La Farge Cement UK - Birmingham
625m of our type VC constant wattage heating cable was supplied and installed to provide frost protection to various pipe works.

Wednesday 18 July 2007

Cadbury - Birmingham
For this tasty project, ESH supplied and installed trace heating to temperature maintain the DHWS at +55°C and also frost protected the CHWS and LTHW pipework. Areas of work to comprise the roof, three risers, toilets and lower ground.

Monday 16 July 2007

Disc Chicksnads STW - Shefford 
The project scope here was to supply and install trace heating and thermal insulation to frost protect the following fittings -  

  • Wash water plumbing station
  • Sludge pumping station
  • Balancing tank
  • Sludge tank
  • Humus pumping station

Wednesday 11 July 2007

Scottish Gas - Edinburgh
Supplied materials and labour to install and commission a trace heating system to provide frost protection to the external chilled water pipework on the buildings roof.

Monday 9 July 2007

Portosilo Ltd - Huntington
Designed, supplied and installed a trace heating system to maintain a temperature of 30°C on both a 1 off screw conveyor tube (fully round) 150mm dia x 7.2m long and a 1 off drop chute 150mm dia x 3m long.

Thursday 5 July 2007

Cerform Ltd - Northampton
The project scope was to supply and install trace heating to temperature maintain 228m of 3" stainless steel Emulsion pipework at +40°C and to frost protect 25m of 2" water pipework.

Tuesday 3 July 2007

M&S Store - Eagle Centre Derby
ESH supplied and installed a trace heating system to frost protect the roof mounted CHW, heating and cold water pipework. 360m of pipework in total.

Monday 2 July 2007

ASDA Distribution Centre - Washington 
Supplied our type VC constant wattage tape to provide frost protection.