Thursday 27 September 2007

Paradise Street Site 13 - Liverpool
ESH were contracted for the second time at this site, this time to supply materials and labour to frost protect 90m of BCWS pipework.

Monday 24 September 2007

BT Oswestry Data Centre
For this our second project within the Data Centre, ESH designed, supplied and installed a Aqualarm leak detection system, based on perimeter sensing, covering AC units and condensate pipework crossing the Comms room.

Thursday 20 September 2007

Lane Shaw WWTW - Colne 
ESH supplied and installed 300m of type FBTBOJ self regulating heating tape to various plant areas.

Monday 17 September 2007

Reckitt Beckniser Ltd - Derby
For our second project here, ESH supplied materials and labour to install a trace heating system to maintain a temperature of +30°C on two steel vessels. Each vessel was 2.75m Ø and 7.1m tall overall, resting on legs.

Thursday 13 September 2007

Avonmouth WWTW
Supplied and installed frost protection trace heating to steel, stainless and plastic pipework in the following areas: 

  • 170m of digester feed pipework
  • 80m of stainless/ductile pipework from tank to gravity feed thickener units
  • 49m of plastic pipework to GFT units
  • 65m of sludge feed pipes to 3 mono pumps
  • 137m of washwater pipe from pump area to GFT area
  • 50m of hydrant washwater pipework
  • 12m of galvanised drain pipework

Friday 7 September 2007

Paradise Street Site 13 - Liverpool
Supplied and installed trace heating to provide frost protection to 110m of 22mm Ø copper pipework.

Thursday 6 September 2007

BT Oswestry Data Centre
Supplied materials and labour to install a trace heating system to provide frost protection to exposed chilled water pipework in the following areas: 

  • Hall One pipework - 81m
  • Compound A pipework - 310m
  • Gantry B pipework - 708m

Monday 3 September 2007

Craven Swimming Pool - Skipton
Supplied materials and labour to install and commission the trace heating system to provide frost protection on the external heating pipework.