Paradise Street Site 13 - Liverpool
ESH were contracted for the second time at this site, this time to supply materials and labour to frost protect 90m of BCWS pipework.
Thursday 27 September 2007
Monday 24 September 2007
Thursday 20 September 2007
Monday 17 September 2007
Thursday 13 September 2007
Avonmouth WWTW
Supplied and installed frost protection trace heating to steel, stainless and plastic pipework in the following areas:
Supplied and installed frost protection trace heating to steel, stainless and plastic pipework in the following areas:
- 170m of digester feed pipework
- 80m of stainless/ductile pipework from tank to gravity feed thickener units
- 49m of plastic pipework to GFT units
- 65m of sludge feed pipes to 3 mono pumps
- 137m of washwater pipe from pump area to GFT area
- 50m of hydrant washwater pipework
- 12m of galvanised drain pipework
Friday 7 September 2007
Thursday 6 September 2007