Derby STW
For this project we supplied and installed a 240 volt trace heating frost protection system for plastic pipework to be maintained at around +15°C.
Drayton House - Stourbridge
ESH designed, supplied and installed a leak detection system to provide frost protection to the basement area.
Welwyn Garden Carriage Wash
Supplied, installed and commissioned the frost protection trace heating and insulation.
Far Baulker Pumping Station
Supplied and installed the trace heating systems to provide frost protection on the following circuits - Anion units, Waste water tank, Salt saturation & Recovered rinse water tank pipelines.
Sunrise Senior Living - Tettenhall
Supplied labour and materials to install and commission trace heating to the external CHW, Irrigation, VT and CT heating pipework.