Sittingbourne WWTW - Kent
For this our second project within this WWTW, ESH supplied and installed the trace heating, lagging and cladding to 25m of plastic pipework providing frost protection.
Stadco Ltd - Shrewsbury
Within this Zone 1 Gas Group IIB temp Class T3 Hazardous Area, ESH supplied and installed the trace heating, lagging and cladding to provide frost protection to the Sea Water inlet and outlet pipework.
HSBC National Data Centre - Bootle
For this large project ESH provided frost protection trace heating to the chilled water pipework up to 200mm NB and also two buffer vessels. Just over 1200m of VC constant wattage tape was supplied and installed .
Ronseal Ltd - Sheffield
Supplied, installed and commissioned the trace heating, lagging and cladding to the sprinkler system to provide frost protection.
TS Tech UK Ltd - Swindon
Designed and supplied 3 IBC heating jackets 1000w 240v complete with thermostat control.