ESH
designed and supplied 2 x pump heating jackets - 1.5KW at 110v supply.
Smallmead Waste Management - Reading To supply and install trace heating and thermal insulation to provide frost protection to the fire pump suction & delivery lines, the external MRF building distribution mains plus internal grid lines 4 to 19 and the tank infill line.
Thursday, 29 November 2007
Marks & Spencers - Eden For this brand new store, ESH supplied and installed trace heating to provide frost protection to the HWS flow & return, MWS, BCWS, IBCWS and the warning pipework within the canopy and tankroom areas.
Monday, 26 November 2007
New B&Q Store - Halifax For this new store, ESH supplied and installed 45m of trace heating to frost protect the cold water services.
Thursday, 22 November 2007
Saacke Ltd - Portsmouth Designed and supplied 180 x SP80/2 spiral wire 1.8m length, 80w/m, 240v heating tape.
Tuesday, 20 November 2007
Sun Valley Foods - Lincoln Supplied materials only to provide frost protection to 25mm Ø blue ABS water pipework.
Monday, 19 November 2007
Instrument Design Technology Ltd - Warrington Designed and supplied a high temperature bake out heating jacket which provided a operating temperature at +250°C with a 220v supply.