Disc Chicksands STW - Shefford
ESH were contracted to go back to this site to supply and install thermal insulation to the trace heated pipework which we previously installed.
Monday, 29 October 2007
Thursday, 25 October 2007
Monday, 22 October 2007
Friday, 19 October 2007
Thursday, 18 October 2007
Wednesday, 17 October 2007
Drayton House - Stourbridge
ESH were contracted to upgrade the existing leak detection control panel to a 20 zone unit and return to site to re-terminate the 16 zones and install 4 new zones monitoring oil detectors, located under the oil feed pipe line and around the final connection to the boiler.
ESH were contracted to upgrade the existing leak detection control panel to a 20 zone unit and return to site to re-terminate the 16 zones and install 4 new zones monitoring oil detectors, located under the oil feed pipe line and around the final connection to the boiler.