Monday, 30 July 2007

Alstom Power Ltd - Rugby
Supplied and installed trace heating and thermal insulation to temperature maintain a VDR vapour storage vessel and its associated pipework. The 100mm NB suction pipework needed to maintain a temperature of +15°C whilst the remainder, including the vessel, needed to maintain +25°C to prevent condensation.

Friday, 27 July 2007

Leyton Orient Football Club - North Stand
At the home of this East London football club, ESH supplied and installed the trace heating system to provide frost protection to the MCW pipework within the stadiums North Stand.

Wednesday, 25 July 2007

Andrew Corporation - USA
For the second time this year, ESH supplied and designed 32 x 3.7 dish heater panels heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Monday, 23 July 2007

La Farge Cement UK - Birmingham
625m of our type VC constant wattage heating cable was supplied and installed to provide frost protection to various pipe works.

Wednesday, 18 July 2007

Cadbury - Birmingham
For this tasty project, ESH supplied and installed trace heating to temperature maintain the DHWS at +55°C and also frost protected the CHWS and LTHW pipework. Areas of work to comprise the roof, three risers, toilets and lower ground.

Monday, 16 July 2007

Disc Chicksnads STW - Shefford 
The project scope here was to supply and install trace heating and thermal insulation to frost protect the following fittings -  

  • Wash water plumbing station
  • Sludge pumping station
  • Balancing tank
  • Sludge tank
  • Humus pumping station

Wednesday, 11 July 2007

Scottish Gas - Edinburgh
Supplied materials and labour to install and commission a trace heating system to provide frost protection to the external chilled water pipework on the buildings roof.