Tuesday, 26 June 2007

Derby STW
For this project we supplied and installed a 240 volt trace heating frost protection system for plastic pipework to be maintained at around +15°C.

Friday, 22 June 2007

Drayton House - Stourbridge 
ESH designed, supplied and installed a leak detection system to provide frost protection to the basement area.

Wednesday, 20 June 2007

Welwyn Garden Carriage Wash
Supplied, installed and commissioned the frost protection trace heating and insulation.

Monday, 11 June 2007

Far Baulker Pumping Station
Supplied and installed the trace heating systems to provide frost protection on the following circuits - Anion units, Waste water tank, Salt saturation & Recovered rinse water tank pipelines.

Monday, 4 June 2007

Sunrise Senior Living - Tettenhall
Supplied labour and materials to install and commission trace heating to the external CHW, Irrigation, VT and CT heating pipework.

Monday, 28 May 2007

St Stephens Shopping Centre - Hull

Within Hulls most stylish shopping centre, we supplied and installed the Trace Heating system to provide frost protection to the main chilled water services. To complete the project we ended up using 1200m of FBT10/2 heating tape.

Thursday, 24 May 2007

HSBC National Data Centre - Bootle
Our second project here was to supply and install frost protection trace heating for the external secondary containment light fuel oil pipework.