Tuesday, 3 July 2007

M&S Store - Eagle Centre Derby
ESH supplied and installed a trace heating system to frost protect the roof mounted CHW, heating and cold water pipework. 360m of pipework in total.

Monday, 2 July 2007

ASDA Distribution Centre - Washington 
Supplied our type VC constant wattage tape to provide frost protection.

Tuesday, 26 June 2007

Derby STW
For this project we supplied and installed a 240 volt trace heating frost protection system for plastic pipework to be maintained at around +15°C.

Friday, 22 June 2007

Drayton House - Stourbridge 
ESH designed, supplied and installed a leak detection system to provide frost protection to the basement area.

Wednesday, 20 June 2007

Welwyn Garden Carriage Wash
Supplied, installed and commissioned the frost protection trace heating and insulation.

Monday, 11 June 2007

Far Baulker Pumping Station
Supplied and installed the trace heating systems to provide frost protection on the following circuits - Anion units, Waste water tank, Salt saturation & Recovered rinse water tank pipelines.

Monday, 4 June 2007

Sunrise Senior Living - Tettenhall
Supplied labour and materials to install and commission trace heating to the external CHW, Irrigation, VT and CT heating pipework.